Maintain To Profit Renovations can assist you with building projects all over Hamilton and Waikato. Our service covers the greater Waikato region and will ensure that your new home is completed to the highest standard of building. We are fully registered and qualified builders and offer all renovation services including bathroom and kitchen as well as full home renovations. Please fill out the form above to get in contact with us.

Mike Wilson
General Manager
39 Aberdeen Drive, Dinsdale, Hamilton 3204

Phone: 0508 2 RENOVATE
027 460 8658

Email: info@renovations.nz

Website: www.renovations.nz

 

Renovations And Home Building In Hamilton And Waikato

Is it time to do some work on your Hamilton home? Is your home looking run down or is it just time for a change? Whatever the reason, we can help you to begin your Hamilton renovation. Our Hamilton renovation team specialised in all areas of home building and renovation including bathroom, kitchen and complete home rebuilds as well as extensions and even building new homes. So whether you just want a new room or a room redone or if you need a whole you need, we can help!

We cover all areas of the Waikato including:

  • Hamilton
  • Taupo
  • Hauraki
  • Cambridge
  • Coromandel

Renovations in Hamilton and Waikato
If you just want to do up your Hamilton home to make it more modern, update it’s looks and improve it’s function, a renovation is for you. At first, renovating may seem like a simple task, but can quickly get complicated if you are not experienced in the work and especially if you are doing rooms such as a kitchen or bathroom which require addition work such as plumbing to be completed. Who do you hire to do that? How much is it going to add to the cost? Do I need certification or permits? Things can quickly get out of hand.
We at Maintain To Profit Renovations will take care of the entire process. We have networks of tradesmen in Hamilton and the Waikato who we work with to ensure that your renovation is done smoothly, on time and budget and to the highest possible standard. No stress or worry for you.

Building New Hamilton Homes
Along with the renovations, we also specialise in building complete new homes. If you would rather start over or have an empty plot of land, this is the perfect solution for you to make your dream home a reality. From the design process right up to the final coat of paint, we and well connected in the industry to get the very best on the job to provide you with a top of the line home that meets your requirements.

MIKE WILSON

MIKE WILSON
 

Our renovation process – Bathrooms


Address

Our renovation process – Bathrooms

A majority of the renovation work we do for customers involves some kind of upgrade to a bathroom. Whether you are wanting to simply put in an new acrylic shower and touch up the paint job? Or you want to re-design the floorplan, strip back the linings and possibly tile all walls and floors? Demo phase: Our builders will focus on the demolition stage during the first 1-2 days of the project. If you are moving the position of the shower/vanity or bath this stage enables the builders to pull back the wall linings for the plumber to come in and run their pipework. We do often find evidence of leaks during the demolition stage and if this does happen during your renovation we do make it priority to advise the customer along the way so you know exactly what is happening at every point of the project. Plumber/Electrician: Both these trades are incredibly important, but often aren’t onsite for as long as other trades as they need to work in and around the builder. As you can appreciate there is often limited space in bathrooms so subtrade tend to be booked on separate days/time to allow them the space to get in and get their jobs done efficiently. Stopper/Painter: This stage requires multiple visits to site for both the stopper and the painter – for good reason! They need to apply multiple coats of plaster and paint – which also need to dry and be sanded back. Tiler: Tiling takes the longest amount of time out of all the trades. If you are having a fully tiled shower (floor and walls) the tiler needs…

Our renovation process – Bathrooms

A majority of the renovation work we do for customers involves some kind of upgrade to a bathroom. Whether you are wanting to simply put in an new acrylic shower and touch up the paint job? Or you want to re-design the floorplan, strip back the linings and possibly tile all walls and floors?

Demo phase: Our builders will focus on the demolition stage during the first 1-2 days of the project. If you are moving the position of the shower/vanity or bath this stage enables the builders to pull back the wall linings for the plumber to come in and run their pipework. We do often find evidence of leaks during the demolition stage and if this does happen during your renovation we do make it priority to advise the customer along the way so you know exactly what is happening at every point of the project.

Plumber/Electrician: Both these trades are incredibly important, but often aren’t onsite for as long as other trades as they need to work in and around the builder. As you can appreciate there is often limited space in bathrooms so subtrade tend to be booked on separate days/time to allow them the space to get in and get their jobs done efficiently.

Stopper/Painter: This stage requires multiple visits to site for both the stopper and the painter – for good reason! They need to apply multiple coats of plaster and paint – which also need to dry and be sanded back.

Tiler: Tiling takes the longest amount of time out of all the trades. If you are having a fully tiled shower (floor and walls) the tiler needs to waterproof the area first before the tiling starts. We often allow for the tiler to be onsite for over a week, depending on the size of the bathroom.

Flooring: Another option for flooring for bathrooms is vinyl. This option if normally tends to be more cost effective, and is great for a wet area. Vinyl installation is very quick compared to tiling – up to 3-4 hours.

Fit off: The builder will return at the end of the project to ‘fit off’. This involves fitting the vanity, toilet roll holder etc. and any remaining skirting or finishing touches.

Even though the bathroom is a small space in comparison to the rest of the home – during a bathroom renovation we need to juggle a number of different subtrades – which all need to work together! Apart of our service is to project manage this process for you and take away the stress & organisation require for each step.

A staged reno – St Andrews


Address

A staged reno – St Andrews

We appreciate that when you decide to renovate your home there will be some disruption to everyday life! Especially if you decide to completely renovate your home. Sometimes it isn’t an option to move out of the property. Recently, a customer of ours decided she wanted to complete a full renovation of her home – but due to space we organised a staged approach to the renovation to allow her room to move furniture around and gave her a break between each stage. Stage one – This involved the renovation of the bathroom/toilet, master bedroom and spare bedroom. The project during this stage took 4 weeks Stage two – We moved into the lounge and kitchen area. We removed the wooden lining in the lounge area and replaced the raking ceiling with gib, for a paint finish. She designed a whole new kitchen and removed the wall between to the two areas to open up the floorplan. Stage three – Involved refreshing all the outdoor living areas. New decks, a ramp for access, raised flower gardens and new fencing was built. This stage was dependant on weather but was completed quickly within 2 weeks. Adopting a staged approach to renovations is an option when you start planning your project – we are happy to work in with your requirements as we want to provide you with a smooth reno process from start to finish.

A staged reno – St Andrews

We appreciate that when you decide to renovate your home there will be some disruption to everyday life! Especially if you decide to completely renovate your home. Sometimes it isn’t an option to move out of the property.

Recently, a customer of ours decided she wanted to complete a full renovation of her home – but due to space we organised a staged approach to the renovation to allow her room to move furniture around and gave her a break between each stage.

Stage one – This involved the renovation of the bathroom/toilet, master bedroom and spare bedroom. The project during this stage took 4 weeks

Stage two – We moved into the lounge and kitchen area. We removed the wooden lining in the lounge area and replaced the raking ceiling with gib, for a paint finish. She designed a whole new kitchen and removed the wall between to the two areas to open up the floorplan.

Stage three – Involved refreshing all the outdoor living areas. New decks, a ramp for access, raised flower gardens and new fencing was built. This stage was dependant on weather but was completed quickly within 2 weeks.

Adopting a staged approach to renovations is an option when you start planning your project – we are happy to work in with your requirements as we want to provide you with a smooth reno process from start to finish.

49 Helvetia Dr


Address

49 Helvetia Dr

Complete inside and outside home renovation completed by Maintain To Profit Renovations at 49 Helvetia Dr.

49 Helvetia Dr

Complete inside and outside home renovation completed by Maintain To Profit Renovations at 49 Helvetia Dr.